Sunday, January 31, 2010

Track

I was reading the Salt Lake Route series in the Mar MR today. The discussion about the Kato Unitrak double track super-elevated curves really has my attention. Since a lot of use like modern equipment maybe we should consider that. Double stacks and high cars really look good on super-elevated curves. It is worth discussing.

Wednesday, January 27, 2010

A Response to "Wiring"

Milt,

You have Hit the Nail on the Head with regard to the wiring issues we will face. I believe that we will see similar challenges in track and scenery design as well. Unless the tracks always hit exactly the same location at the end of each module (aka N-Trak) we cannot move modules around. The scenery really also needs to match ... imagine if a mountain continued from one section to another ... what happens when one module is missing?

In order to facilitate true automation, a permanent layout is really expected with components that are always in the same place. If we use a modular design, and expect the individual modules to come and go, as well as move around, we will have a very difficult time designing an automation system that will work from setup to setup. In fact, the whole concept of train detection and signaling requires a constant track plan.

At the next meeting we can review some of the wiring issues and look closely at the wiring designs I have done so far. Then we can discuss the positives & negatives of a modular vs. permanent layout.

Let's hear from everybody on this issue ... it really is one we need to deal with as a group!

Richard

Wiring

I am still struggling with the wiring concept for our proposed layout from a construction standpoint. Since we are likely to be modular for quite some time this has to be quick and easy to set up and tear down. I am shooting for way less time than N-Trak. I think the drawer idea is super, but what bothers me is we are likely not to have the same modules in the layout at all times. It seems this could confuse the system. And we don't want to be running a new set of wires back to the drawer each time we add a module. One solution might be to have each module as a detection zone, but this still requires a set of wires for each module and doesn't tell the computer which module it is. And how long should the wires be? I understand that every section does not have to be a detection zone so we could require certain modules to be in specific places every time we set-up. But this could severely limit flexibility. I wonder if it is possible to add a decoder to each module that could identify it to the computer, or could we use bluetooth to hook it up?

I think all the other problems of construction are fairly easy to solve. This one has me running in circles. We need everyones input on how this can be done. No idea is a bad one, but no ideas is bad. We need true plug and play for this.

Tuesday, January 26, 2010

Name

See name comments below.

Saturday, January 23, 2010

Name

I am not totally convinced we have the right name yet. Can we think about it some more?

Thursday, January 21, 2010

Era

I like transition era because of steam. But I prefer the bigger modern diesels for more color, pulling longer trains and modern trains like containers. I think we can easily design this thing to work for all. As Malcom said, most of modern Arizona seems to look like it did in the 50"s anyhow.
I would like to see wide range of era's. 1930's to present if possible. How the layout is detailed can provide many opportunities for a range of towns, cities, and wide open spaces. Many towns in the AZ landscape still have that 1950's to 1980's look.

Wednesday, January 20, 2010

Railroad Era

I voted other. Thought I think we should be transition era I think we might want to give some more thought as to where.

Tuesday, January 19, 2010

The dog-bone layout in mod-u-trak will take up what kind of foot-print?